DAG
DAG hardhats set on groundbreaking shovels in the cleared site, with an excavator behind, Opa-locka
CompletedCommercial · Opa-locka

An office building,from the first shovel.

A two-story commercial office in Opa-locka, built from the ground up. The building is complete. The photographs record the build, from groundbreaking day through block walls and formwork, and the finished building from the street.

CommercialSector
Opa-lockaNeighborhood
Ground-up two-story office buildingScope
CompletedStatus
Gold groundbreaking shovels standing in the site fill
01 · The brief

A two-story office, built from a cleared lot.

Ground-up commercial construction starts with a survey and a set of drawings and nothing else. Here the drawings called for a two-story office building in Opa-locka, and the job was to deliver it on a schedule an owner could plan a business around.

Before pricing, the plans are read for what they leave out, and the schedule is built around permitting, inspections and the long-lead items that decide a commercial timeline. High-rise construction runs this way because it has to. DAG Development and Construction runs this way on purpose.

We read the plans for what is missing, not just what is drawn.
Groundbreaking table with hardhats and shovels under the DAG banner
02 · Groundbreaking

Shovels in the ground, hardhats on the table.

Groundbreaking day is photographed the way it happened: gold shovels standing in the site fill, the excavator behind, the site fence around it. A table under the DAG banner holds the hardhats and the shovels, lined up for the owner and the people who made the project possible.

It is the one ceremonial day on a commercial job. Everything after it is sequence: excavation, footings, the slab, and the trades that follow in an order that is planned before the first truck arrives, and reported to the owner in writing.

Speed is not shortcuts. We move fast because we plan hard.
Concrete block units stacked on site for the walls, close up
03 · Block and formwork

Block for the walls, formwork against them.

The structure is concrete block and poured concrete, the standard for South Florida commercial buildings because it stands up to wind and water. The photographs show the block stacked for the walls, then formwork and a ladder against a block wall as a pour is prepared.

Every course and every pour is inspected before it is covered. Found conditions in the ground or in the structure are photographed, priced and sent to the owner before work continues, and the written report says what changed and what it means for the date.

The work you will never see is the work that holds it all together.
Two-story office building in grey stucco with a white band, from the street, Opa-locka
04 · Finished

The finished building, seen from the street.

The finished building is two stories of grey stucco with a white band, photographed from the street. It is the first thing a visitor sees and the last thing the build produces, and it is standing where the shovels were.

DAG builds commercial work for private, institutional and faith-based owners, who all want the same thing: a building delivered on the date, with the reporting to show it along the way. That is what this one was built to be.

You will always be able to reach us.
All commercial workHome
Contact
0
1
2
3
4
5
6
7
8
9
0
1
2
3
4
5
6
7
8
9
0
1
2
3
4
5
6
7
8
9
-0
1
2
3
4
5
6
7
8
9
0
1
2
3
4
5
6
7
8
9
0
1
2
3
4
5
6
7
8
9
-0
1
2
3
4
5
6
7
8
9
0
1
2
3
4
5
6
7
8
9
0
1
2
3
4
5
6
7
8
9
0
1
2
3
4
5
6
7
8
9
Every call and message gets a reply from someone on our team.
info@dagdc.com

Call 305-999-5401, or send the form below. If you have the address, a rough idea of the scope and any drawings, bring them. If you have none of that yet, call anyway.

Someone from our team will call you back to talk through scope and timing.
Sent. Someone from our team will call you back.